Call Me
Please enter valid Security Code.
Thank you for submitting the form.
Free Consultation
Please enter valid Security Code.
Thank you for submitting the form.
Call Me
Free Consultation
Company
Profile
Vision/Mission
Team
Infrastructure
Solutions
Design
Tooling
Injection Moulds
Automomtive Tooling
Caps Closures Tooling
General Engineering Tooling
Die Casting Dies
Pilot Tooling
Production
Injection Moulding
Products Assembly
Industry We Serve
FMCG
Healthcare
Appliances
Furniture
Automotive
Work
Contact
Careers
Enquiry
Menu
Home
Company
Profile
Vision/Mission
Team
Infrastructure
Solutions
Design
Tooling
Injection Moulds
Automomtive Tooling
Caps Closures Tooling
General Engineering Tooling
Die Casting Dies
Pilot Tooling
Production
Injection Moulding
Products Assembly
Industry We Serve
FMCG
Healthcare
Appliances
Furniture
Automotive
Work
Contact
Careers
Enquiry
Call Me
Free Consultancy
Home
Company
Infrastructure
Tooling
Profile
Vision / Mission
Team
Infrastructure
Profile
Vision / Mission
Team
Infrastructure
Design
Tooling
Production
Tooling
Mold Development capacity
Shop floor area
:
8000 Sq.Ft located in TTC MIDC Khairane.
Max. mold size
:
1500 x 800
Max mold weight
:
5000 Kg
Cycle time
:
60 days for 15 molds simultaneously (focused module). 125 tools p.a.approx.
Mold Development capability
Pre hardened inj. Molds (Class 102 molds as per SPI)
Hot runner & semi-hot runner molds
Unscrew type molds for caps, multi cavity fliptop cap molds
Molds for medical devices & pharma packaging
Molds for electrical switchgear applications
Compression molds
SMC /DMC/ Epoxy molds
High pressure Die casting dies/LPDC
Vacuum hardened-high production Molds (Class 101 molds as per SPI)
Gravity die casting dies
Staff
Technical Workforce
:
15 tool engineers with tool mfg. experience.
Tool room operators/workmen
:
25.
Design
Tooling
Production
Design
Tooling
Production
© Copyright 2017, Integrated CADCAM Solutions Pvt. Ltd